Australia · Trade press for cleaning contractors

The Australian journal of commercial cleaning

Cleaning Contractors

Tenders, labour, chemicals, compliance and the contract book — written for people who run the job.

Contracts and tendering

How to win commercial cleaning tenders in Australia

Winning a cleaning tender is less about a cheap square-metre rate than about deciding which documents deserve a response, inspecting the building properly, and writing a method an evaluation panel can score.

Editorial desk · 11 February 2025 · Updated 18 March 2026

Melbourne CBD skyline viewed from the south
Melbourne CBD skyline — DXR, Wikimedia Commons, CC BY-SA 4.0 Image credits

The tender document does not care that you cleaned the building next door for nine years. It cares whether you can lodge a conforming response before the cutoff, under the legal entity that holds the insurance, with a method an evaluation panel can score against the criteria they published. If you treat the pack as a request for a cheaper mop, you will either lose or — worse — win.

Commercial cleaning in Australia is bought the way other facilities services are bought: through portals, panels, and the occasional invitation that arrives because someone on the building knows your supervisor. The work is real. The paperwork is the filter. This piece sits in the contracts and tendering hub because that is where the money is decided, long before the first vacuum comes off the van.

Where the work actually sits

If you only watch one feed, you will miss the jobs that match your labour. Commonwealth entities advertise on AusTender. State agencies use their own systems — NSW eTendering and buy.nsw, Buying for Victoria, QTenders, Tenders WA, SA Tenders and Contracts, Tenders ACT, and the Tasmanian and Northern Territory portals. Local government and a large slice of universities, hospitals and corporates run through VendorPanel. TenderLink and similar notification services sit on top of those sources and email you a digest. None of them will interpret the specification for you.

Set saved searches that match what you can actually staff: commercial office, education, health, transport, or industrial, in the cities and regions where you already have a supervisor. A tender for a remote school cluster is not a win if the nearest competent leading hand is four hours away and the Award travel arrangements eat the margin. A tower in the Melbourne CBD is not a win if you have never run after-hours access through a unionised security desk.

Read the closing time in the buyer’s timezone, then subtract a working day. Portals do not accept “the PDF was uploading”. If the buyer requires a hard-copy original as well as an electronic lodge — still not extinct in some agencies — treat the courier cutoff as the real deadline.

Panels versus one-off RFTs

A one-off request for tender, request for quote or invitation to supply is a defined job: these buildings, this term, this draft contract. You either win it or you do not. A panel, standing offer or prequalification list is different. You spend the same effort proving capability, insurance, WHS and financials, and what you receive is the right to compete again when a work order, mini-competition or further quote is issued.

Panels are worth the paper when the buyer actually uses them. Some state facilities contracts and some local-government panels move real hours. Others sit as a badge on a website while the incumbent keeps the keys. Ask, before you write twenty pages, how work will be allocated: rotation, further competition, or “as required” at the contract manager’s discretion. If the answer is discretion and you are the new small firm on a list of twelve, price the bid as marketing, not as next year’s wages.

Open panels can be joined later. Closed panels cannot. If you miss a closed Commonwealth or state arrangement, you are out until it is refreshed — often three or more years. That is a genuine go/no-go of its own: some firms keep a calendar of panel refresh dates the way they keep a chemical register.

A go/no-go you will actually use

Most lost money in this trade is not a lost tender. It is a tender you should never have written, or a tender you won and cannot staff. Write the go/no-go on one page and make someone other than the person who enjoys bidding apply it. Useful tests, none of them clever:

  • Can we inspect the site, or is the buyer refusing access and asking you to price from a floor plan and a photograph?
  • Do we already have a supervisor who can reach the building in ordinary traffic at the start of the shift?
  • Can the hours in the specification be rostered under the Cleaning Services Award 2020 without inventing unpaid time?
  • Does the draft contract pass risk you cannot price — unlimited indemnities, liquidated damages with no cap, or “clean as required” with no definition of required?
  • Are the insurance, modern slavery, WHS and local-content requirements things you can evidence this month, or things you would have to pretend?
  • Who is the incumbent, and why are they leaving? If you cannot find out, assume the building is hard or the buyer is worse.

If two or more of those answers are ugly, stop. Walking away is a commercial skill, not a moral failure. The firms that stay solvent treat a no-bid as a result.

Price is not a go/no-go on its own. You still have to price the square metres after you decide the job is real. The go/no-go decides whether that arithmetic is worth starting.

The site inspection is the tender

Mandatory briefings exist because buyers got tired of prices that assumed a carpeted office when the building is terrazzo, food service and a loading dock. If attendance is mandatory, you are not there to collect a name-tag. You are there to see soil load, access, storage, waste rooms, and the distance from the cleaners’ cupboard to the furthest amenity.

Arrive with the specification printed, or on a tablet you can mark. Walk the floors the cleaners will walk, at the hour they will walk them if the buyer will allow it. A 10am inspection of a food court tells you almost nothing about 8pm. Ask who holds the keys and who resets the alarm. Ask where consumables are stored and who buys them. Ask whether the building runs events, night fill, or construction on occupied floors. Ask what the last contractor was blamed for that was actually a fabric or HVAC problem.

Photograph what the buyer will let you photograph. Measure a sample of amenities against the room data sheets. If the square-metre schedule is short by a wing, or includes a car park that the scope later excludes, that discrepancy is the whole bid. Reading the specification the way the facility manager wrote it is the skill; the inspection is where you test whether they meant it.

If two people from your firm can attend, send operations and estimating, not sales and sales. The person who will roster the job should be the person who looks at the service lift.

Methodology is not a slogan

Evaluation panels are not judging your brand colour. They are trying to give a mark against published criteria. “We take pride in our work” scores nothing. A method that says who is on site, what they do in the first two hours, how a leading hand inspects, how a complaint at 7:15am is closed, and how periodic work is scheduled against the daily roster — that can be scored.

Write the method against the building, not against a template from the last school contract. If the specification is frequency-based, show that you can hit the frequencies with a roster, not with hope. If it is outcome-based, show the inspection standard, the rectification window, and what you will do when occupant behaviour or weather makes the outcome temporarily impossible. That last point belongs in the service level agreement you will later have to live with. Do not promise a standard in the tender that the draft SLA will punish you for missing.

Labour is the method. Name the Award classification you intend to use. Say how you will cover leave, no-shows and public holidays without stripping the building. Say whether you will use labour-hire — and if you will, say how you meet the labour-hire licensing rules in Victoria, Queensland, South Australia or the ACT. Evaluation panels have read enough bids that treat “flexible workforce” as a synonym for people with no sick leave.

Supervision is the method. A leading hand who is also the only cleaner on a 2,000-square-metre floor is not supervision. Say how often a supervisor who is not pushing a trolley will be in the building, and what they will look at.

Price without theatre

Price still matters. On many commercial RFTs it is half the score or more. On some it is a threshold: fail value-for-money and the rest of the writing is decoration. The mistake is not “being too dear”. The mistake is submitting a number that cannot pay Award wages, superannuation, workers compensation, leave, chemicals, equipment, supervision and the time you will spend on the buyer’s portal arguing about a missed bin.

Do not dump a single square-metre rate into a cell and hope. Build the hours from the specification, then cost the hours, then add the periodics, then add the site-specific costs the inspection found — access delays, extra waste runs, consumables you are expected to supply, a working-at-heights ticket for the atrium. If the buyer’s pricing schedule will not let you show that build-up, keep it in your file. You will need it when they ask you to “sharpen the pencil” after preferred-tenderer notifications.

A bid that is dramatically cheaper than everyone else does not look clever. It looks like you missed a wing, missed weekend penalties, or plan to understaff. Evaluation panels are allowed to treat an abnormally low bid as a risk. Some government methodologies require them to. If your number is genuinely lower because you are already next door and share a supervisor, say so in the method. Unexplained cheapness is not a strategy.

Referees are not a courtesy paragraph

Past performance is often a scored criterion of its own. A referee who “will say we are very good” is useless if they cannot speak to a building of similar size, soil and hours. Give the panel people who will pick up the phone: a facilities manager, a contract administrator, a centre manager. Tell those people a tender is coming. Tell them which building and which hours. A referee surprised by a call on a closing week is how you lose a close evaluation.

If you are new to government work, do not invent a portfolio. Use the commercial buildings you have, be honest about scale, and put the weight on method and WHS. Panels would rather read a smaller relevant job than a vague claim about “various CBDs”. If you have lost a contract, assume the buyer can find out. Explain what you changed.

The compliance pack is part of the bid

Australian buyers will ask for certificates of currency — public liability, workers compensation in the state of the work, motor vehicle if you will be on their site, sometimes professional indemnity. The legal name on those certificates must match the legal name on the tender form. A trading name on a van is not an entity. A group policy that does not name the bidding company is a non-conforming bid in a lot of government processes.

They will ask for a WHS management plan or at least a WHS system description, Safe Work Method Statements for the tasks you will actually do, and evidence that you induct people. They may ask for a modern slavery statement or questionnaire even when you are well under the Commonwealth reporting threshold. They may ask for quality-system certificates you do not have. ISO 9001, ISO 45001 and ISO 14001 help on large institutional work; they are not a moral requirement for a two-van firm bidding a suburban office. If you do not hold them, say what you do instead, and do not paste a policy you downloaded at 11pm.

Government responses have extra machinery — weighted criteria, local content, page limits, evaluation panels. The commercial tender you are writing this week still borrows that discipline. Answer the question they asked, in the order they asked it, inside the page limit. If they said ten pages, do not send thirty and call it thorough.

After you press submit

Keep the lodge receipt. Keep the exact files you uploaded. If the buyer runs clarification questions, answer only what was asked and get the answer through the portal, not through a friendly phone call that the other tenderers will never see. Probity rules on public work are not optional theatre. They exist because someone always tries the phone call.

If you win, the tender is not the contract. Read the final form of agreement, the service levels, and the variation clause before you order extra machines. If you lose, ask for a debrief. Public buyers will often give you scores against criteria. That debrief is the only free consulting you will get in this trade. Use it on the next bid, or on the decision to stop bidding that class of work.

This journal’s editorial standards are the same test we apply to a tender response: Australian rules, named correctly, no imported OSHA copy, and no number we cannot stand behind. If a buyer’s pack contradicts the Award or the WHS law of the state, say so in your assumptions — or do not bid. Winning is optional. Staying in business is not.

Questions contractors ask

Should we bid every commercial cleaning tender that lands in the inbox?
No. A written go/no-go that you actually follow will save more money than another late Friday night in the portal. If you cannot inspect the site, cannot staff the hours, or cannot live with the draft contract, do not start a response.
Is the cheapest conforming bid the one that wins?
Not always. Many government and institutional buyers score methodology, capability, WHS and past performance as heavily as price. A cheap bid that cannot explain labour, supervision and rectification usually loses to a dearer bid that can.
What is the difference between a panel and a one-off RFT?
A one-off request for tender buys a defined building or bundle. A panel or standing offer gets you onto a shortlist so the buyer can issue work orders later. Being appointed to a panel is not a roster and not a pipeline.